Upper level: d2303 Managing one's own activity level
(4.C.3.d)
Description of the role that time plays in the way the worker performs the tasks required by this job
(additional explanation: Pace and Scheduling)
Lower livel:
d2303w11 Adjustment of work pace
d2303w12 Pace Determined by Speed of Equipment
Go back to the Top.